Kanban Card Display and Time in Stage

Pick what cards show in each stage, and see how long each card has been there.

In toodoori, each stage (column) on your kanban board can show different details on its cards. Cards in a to-do stage can leave out the task number and checklist, while cards in a stage for tasks you’re working on can keep showing checklist progress. Cards can also show how many days they’ve been in their current stage.

A kanban board. Cards in To do show a title, labels, and due date with no task number. Cards in Doing and Waiting on reply show an hourglass and a day count. In Waiting on reply, the 8-day card has a bold day count, the 15-day card's count is in color, and the 22-day card has a tinted background with a colored hourglass

You’ll find these settings under Project Settings > Stages > Card display. If stages and workflow groups are new to you, start with Kanban Board.

Choose what cards show

You can turn eight details on or off for the cards in each stage. The title always shows.

  • Sub-project
  • Priority
  • Task number
  • Time in stage
  • Subtasks
  • Checklist
  • Due date
  • Labels

Every detail except Time in stage is on by default, so your cards keep their current look until you change a setting.

Turning a detail off only hides it on the card. The value stays on the task, and you can still see it in the task details. If you turn off Priority, cards no longer show the color bar on their left edge or the number before the title. Titles also look the same regardless of priority.

Time in stage

Turn on Time in stage, and the card footer shows an hourglass icon and a day count right after the task number, like 9d. The count is the number of calendar days since the card entered its current stage.

  • A card that entered the stage today shows 0d. The count goes up by one each time the date changes in your time zone.
  • Moving a card to another stage starts the count over at 0.
  • Hover over the count to see when the card entered the stage, for example “9 days in this stage (since 11/1)”.

If you keep a stage for tasks that are waiting on someone else, each card shows how many days it’s been since you reached out. When you’re deciding whom to follow up with, you don’t need to keep track of the dates yourself.

Change cards by time in stage

You can add rules that change how a card looks once it has been in a stage for a set number of days. Each rule says “at N days or more, apply one change,” and each stage can have up to three rules.

There are three changes to choose from.

  • Bold day count: shows the day count in bold.
  • Color day count: colors the day count and the hourglass icon. On a tinted card, only the icon is in color, and the count is bold.
  • Tint card: adds a light background color to the card.

A card can match more than one rule at once. Bold day count and Color day count both change the day count, so when a card matches both, only the rule with more days applies. Tint card changes the background instead, so it applies along with either one.

In the Waiting on reply stage shown above, the rules are Bold day count at 7 days, Color day count at 14 days, and Tint card at 21 days. Here’s how that plays out:

  • 3 days: the day count shows as usual.
  • 8 days: the day count is bold.
  • 15 days: the day count is in color.
  • 22 days: the card has a tinted background, and the hourglass icon is in color.

Cards that match a rule show their day count even if Time in stage is off for that stage. That way, a card never changes color without showing why.

For stages in the Finished group, you can choose what cards show, but you can’t add rules. The Inbox appears in its own panel rather than on the board, so it isn’t listed in the card display settings.

Set up card display

The Card display section in project settings. The To do, Doing, and Done stages sit on collapsed rows. The expanded Waiting on reply row shows eight checkboxes under Shown on cards and three rules, each with a number of days, a change, and a preview of the card on one line

  1. In Project Settings, select Stages, then Card display. Each stage sits on a collapsed row with a short summary of its current settings, such as 2 items off cards or 3 rules.
  2. Select a stage’s row to expand it.
  3. Under Shown on cards, check only the details you want on that stage’s cards.
  4. To add a rule, select Add rule, then set the number of days and choose a change. The number of days must be a whole number from 1 to 365. Two rules in the same stage can’t use the same number of days or the same change.
  5. Select Save. The cards in that stage update on the board.

The preview next to each rule’s change menu shows how a card will look at that many days. You save each stage separately. If you collapse a row without saving, your changes stay in place and the summary shows Unsaved. Select Cancel to go back to the last saved settings.